Thank you for your patience while we retrieve your images.
Taken 11-Jul-20
Visitors 2


400 of 637 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions2000 x 1125
Original file size1.81 MB
Image typeJPEG
Color spaceAdobe RGB (1998)
Date taken11-Jul-20 17:45
Date modified12-Jul-20 11:04
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D850
Focal length78 mm
Focal length (35mm)78 mm
Max lens aperturef/2.8
Exposure1/800 at f/13
FlashNot fired
Exposure bias-1/3 EV
Exposure modeAuto
Exposure prog.Shutter priority
ISO speedISO 400
Metering modePattern
Major Works at Langport (2)

Major Works at Langport (2)

A view of the south side of the embankment at Langport, prior to the sun moving round to the north side of the line. The embankment at the up end of the viaduct is receiving a similar treatment in order to prevent subsidence. Heading down the line is a Class 802 set, 802013 in the lead, forming 1C88, the 1603 hrs London Paddington to Plymouth GWR service on Saturday 11 July 2020.